Projects

These are some of the projects that are currently under construction by Olivit

Moody Middle School

  • (SD #43) Coquitlam
  • Value: 20.5 million
  • 3-storey cast-in-place concrete and structural steel construction with extensive architectural features and full site development including parking lot, street upgrades, and deconstruction of existing school buildings.
  • Scheduled completion 2019

pic 5 pic 4 pic 1 pic 6 pic 2

(pictures from April 2016)

pic 03 pic 02 pic 01 pic 04

(pictures from January 2017)
IMG_1507 IMG_1142 IMG_1059 IMG_0964

(pictures from July 2017)

DCIM100MEDIADJI_0016.JPG DCIM100MEDIADJI_0017.JPG DCIM100MEDIADJI_0011.JPG

DCIM100MEDIADJI_0007.JPG

(pictures from July 2018)

 Woodward Hill Elementary School

  • (SD#36) Surrey
  • Value: 4.2 million
  • 2-storey addition with suspended slab, structural steel framing and metal roof.
  • Scheduled completion date 2018IMG_2041(pictures from July 2018)